Engineering Your Vision

Sheraton Hotel

Our company Architect Firm

Watch the videos (2.40s)

Description

The project located in Dimas. The urban and architectural study was based on developing the project's buildings around a center and surrounding the project with roads connecting east to west with all the necessary roads. The total area of the complex 24000 m2 divided into several buildings including: General Establishment of Communications administrative building consisted of six floors, including reception hall, administrative rooms, meeting room, managers and assistants’ rooms, in addition to a floor for the administrative board, and all necessary services. In a total area of (5965) m2 Data saving center consisted of administrative and technical services. In a total area of (1860) m2 Technology incubator consisted of three floors in a total area of (3350) m 2. 9Conference and seminar center for (300) people, consisted of two floors, included meeting rooms and conference halls. The total area of the building was about (1295) m2. Training and rehabilitation center for the scientific and technical staff preparation for communications developing. The center consisted of three floors and included lecture hall, teaching halls, training laboratories, communication laboratories, library, administrative and general services for students. In a total area of (5180 )m2. The complex included housing facilities necessary for administrators and employees like studios, apartments and villas for the ministry guests. the total area (2064) m2. In addition to students’ dorm accommodates about (100) students in more than 54 rooms in a total area 2069 m2. A club for all the employees, workers and students, consisted of two floors including playgrounds, terraces, restaurant and cafeteria in a total area of (1500) m 2 Also

The project was provided with sources of clean energy such as photovoltaic, solar panels and air fans. The project was a full study of the entire complex and site, in addition to the supervision on execution of the public site and the ministry building.

Advantages

,The project included the Ministry of Communications and Technology building, in a total area of ( 5000 )m2. In addition to all technical services required.

Project Details

Client

Ministry of Communications and Technology

Project Year

2002-2005

Category

Interior Design

Project Name

DIMAS Technical Complex

Location

Dimas

Our Portfolio

Showcasing Our Architectural

Sheraton Hotel
DIMAS Technical Complex
Tkiyeh Sulaimanya
Palmyra touristic & residential resort
Residential buildings
Residential complex
Hold And Drag